Before and After…
The photograph on the left is from July 2023, showing the original installation in situ; a DW Windsor Strand on a heritage column with a top-entry bracket. Fast forward about 5 months later, an Urbis Axia 3 on a 6m tubular column now resides, as shown on the right.

Before and After…

The photograph on the left is from July 2023, showing the original installation in situ; a DW Windsor Strand on a heritage column with a top-entry bracket. Fast forward about 5 months later, an Urbis Axia 3 on a 6m tubular column now resides, as shown on the right.

4F60F581-CCB5-4196-B0A7-2FA4C5676603.jpeg IMG_1496.jpeg CA362A0E-6C2E-4F3D-A8B3-1F2BDA546055.jpeg IMG_0453.jpeg IMG_0459.jpeg
File information
Filename:IMG_1129.jpeg
Album name: / Street Lights
Filesize:2474 KiB
Date added:11 Feb, 2024
Dimensions:2048 x 2048 pixels
Displayed:157 times
URL:http://80.229.24.59:9232/gallery/displayimage.php?pid=20112
Favourites:Add to Favourites
Add your comment
Anonymous comments are not allowed here. Log in to post your comment