| FILE 23/1154 | ![]() |
![]() |
![]() |
![]() |
|
|||
|
| File information | |
| Filename: | 387A2881.JPG |
| Album name: | FrontSideBus / Out & About |
| Filesize: | 2547 KiB |
| Date added: | 06 May, 2026 |
| Dimensions: | 1280 x 1920 pixels |
| Displayed: | 169 times |
| URL: | http://80.229.24.59:9232/gallery/displayimage.php?pid=24859 |
| Favourites: | Add to Favourites |
Comment 1 to 4 of 4 Page: 1 |
|
|||
|
The ports of Haifa uses 1000W SON-T and LED.
|
|
|||
|
That would be fun to do bulk clean / change on! That lantern carriage assembly will weigh an absolute ton, and take about 20 mins to lower to the ground
|
|
|||
|
Do you reckon they hand crank it or have a special motorised tool?
|
|
|||
|
They have a motor tool, but they haver to hand crank the first 10 or so turns at the start before lowering and at the end after raising. But even with the tool it takes an age. You'd be there for 45 mins to an hour if you were hand cranking. The winch and cables stay in the base of the mast, it's just the tool they carry around
|
Comment 1 to 4 of 4 Page: 1 |