Before and After…
The photograph on the left is from July 2023, showing the original installation in situ; a DW Windsor Strand on a heritage column with a top-entry bracket. Fast forward about 5 months later, an Urbis Axia 3 on a 6m tubular column now resides, as shown on the right.