Before and After…
The photograph on the left is from July 2023, showing the original installation in situ; a DW Windsor Strand on a heritage column with a top-entry bracket. Fast forward about 5 months later, an Urbis Axia 3 on a 6m tubular column now resides, as shown on the right.

Before and After…

The photograph on the left is from July 2023, showing the original installation in situ; a DW Windsor Strand on a heritage column with a top-entry bracket. Fast forward about 5 months later, an Urbis Axia 3 on a 6m tubular column now resides, as shown on the right.

IMG_5325.jpeg Screenshot_20231028_160926_Gallery.jpg Ikea_100_Watt_GLS.JPG Screenshot_20240629_130919_Gallery.jpg 20240722145402_1.jpg
File information
Filename:IMG_1129.jpeg
Album name: / Street Lights
Filesize:2474 KiB
Date added:11 Feb, 2024
Dimensions:2048 x 2048 pixels
Displayed:148 times
URL:http://80.229.24.59:9232/gallery/displayimage.php?pid=20112
Favourites:Add to Favourites
Add your comment
Anonymous comments are not allowed here. Log in to post your comment